Documenting completed work
The end of a job is the last moment several of these are easy to obtain. A week later, the crew is elsewhere and the file is closed.
What this page cannot establish
- documentation does not establish that the work was performed correctly
- post-work footage records the line on that date only
- SewerOwner cannot assess whether a completed job was done well
Collect before the crew leaves
- post-work camera footage, as a file you hold
- a written description of what was actually done, if it differed from the proposal
- photographs of the open excavation, taken before backfill
- the position of any new cleanout or device, measured to a fixed reference
- the permit number, and confirmation of who closes it out
- the written warranty, including what you must do to keep it valid
- the final invoice matching the described scope
Questions for the end of the job
- Did the work differ from the proposal in any way, and is that written down?
- Where exactly is anything you installed, measured from what?
- When will the permit be closed out, and will I receive the document?
- What maintenance does anything you installed require?
- What would void the warranty?
What would change the answer
- post-work footage
- the permit closeout document
- the written warranty
What to do next
An open permit is invisible until it is expensive, which is usually during a sale.