Rerouting
Installing the line along a different path rather than the existing one.
What this page cannot establish
- SewerOwner cannot establish whether rerouting is appropriate for your property
- this approach cannot establish that a new route is permissible without checking
- this approach cannot establish that the new route avoids all obstructions
What it attempts to do
Establish a new route for the line where the existing route presents difficulties that a same-route method would not resolve.
When contractors may discuss it
These are circumstances in which the approach comes up, not a checklist that makes it correct. There is no situation in which one method is universally right.
- when the existing route runs beneath features that make work impractical
- when the existing route has repeatedly presented problems
- when a shorter or more accessible path exists
What has to be known before applicability can be judged
If a proposal for this work is priced without these, it is priced against assumptions. That is not necessarily wrong — but the assumptions should be written down.
- where the new route would run and what it crosses
- what other buried services are present
- whether easements or property boundaries are involved
- where the new route would connect
Access and site considerations
- affects surfaces along a new path
- may involve easements or neighbouring property
- the abandoned line may need specific treatment
- likely to require permits
What to clarify in a proposal for this work
These are the details that most often differ between two proposals for what sounds like the same job.
- the proposed route, described precisely
- what happens to the abandoned line
- what permissions the new route requires
- restoration along the new route
- whether the new route is recorded for future reference
What to keep afterwards
- a record of the new route
- the permit and inspection record
- post-work footage
Alternatives worth asking about
Asking why one approach is proposed rather than another is a reasonable question, and the answer tells you what the contractor believes about your line.
Traditional excavation
Digging along the line to expose and replace pipe directly.
Expose the line so that pipe can be removed and replaced, and so that what is uncovered can be observed directly.
Cannot establish: the condition of any section outside the excavation; that no further conditions exist elsewhere; that the new installation will perform for any stated period.
Pipe bursting
Pulling a new pipe along the existing route while displacing the old one.
Replace the pipe along its existing route by drawing new pipe through while the existing pipe is displaced outward, using pits rather than a full-length trench.
Cannot establish: that the route is suitable without site-specific assessment; the position of other buried services; that this method is preferable to any other for a given property.
What would change the answer
- where the new route would run and what it crosses
- what other buried services are present
- whether easements or property boundaries are involved
- where the new route would connect
What to do next
A new route can cross recorded interests that the existing one did not, and that is a permissions question before it is a construction one.
Check what the new route crossesIf your situation is different
- You want the same-route options: Trenchless and excavation methods
Related, and why
- Easements and rights of way
A new route raises questions the old one did not.